Duyen Hai Power Station is a 4400 MW complex of under-construction coal-fired power plants located in Duyen Hai District of Tra Vinh Province in Vietnam. It consists of Duyen Hai 1, Duyen Hai 2, Duyen Hai 3 and a seaport coal terminal. The complex is designed to be the largest coal-fired power plants in Vietnam, aimed at supplying power for the most regions of Vietnam and reducing the risk of power shortages while boosting economic growth.
Sahiwal Coal-fired Power Project
1257254484983828480
The Sahiwal Coal Power Plant consists of two 660-megawatt (890,000 hp) plants for a combined capacity of 1,320 MW, and generates 9 billion KWH of electricity per year. The power plant is listed in “Priority Projects” by China Pakistan Economic Corridor (CPEC), and is the first CPEC project to be completed. It is the largest coal-fired power plant with the most advanced technology of the country.
Malaysia Pantai 2 Sewage Treatment Plant
1257254486372143104
Built by China Civil Engineering Corporation (CCECC), the Hawassa industrial park, located in Ethiopia's southern city of Hawassa, some 275 km south of the capital Addis Ababa, to accommodate 60,000 jobs at a (1.3 km²) or 321 acre site, is the largest specialized textile and apparel park in Ethiopia. 1.4m square meter eco-facility was built in the space, providing 410, 000 square meters of factory space across row upon row of massive, gleaming red and grey steel sheds. Hawassa Industrial Park is able to generate export revenue amounting to 1 billion U.S. dollars.
Laos Lamphun Hydropower Station Project
1257254487873703936
Built by China Civil Engineering Corporation (CCECC), the Hawassa industrial park, located in Ethiopia's southern city of Hawassa, some 275 km south of the capital Addis Ababa, to accommodate 60,000 jobs at a (1.3 km²) or 321 acre site, is the largest specialized textile and apparel park in Ethiopia. 1.4m square meter eco-facility was built in the space, providing 410, 000 square meters of factory space across row upon row of massive, gleaming red and grey steel sheds. Hawassa Industrial Park is able to generate export revenue amounting to 1 billion U.S. dollars.
1257254489534648320
The ARAB STEEL CO. is a flagship company of the AL ITTEFAQ STEEL CO. and is already setting up a green-field and integrated steel plant with a capacity limit of up to 4.5 million tons. A new plant with a capacity up to 10 million tons is planned to be set up in four phases, and it will be the largest steel plant in KSA specialized to provide steel materials for Saudi and other Middle East areas. A power plant is designed to be built in the plant area. The first phase begun in 2012 and the designed capacity was 1.5 million tons.
Bozshakol Copper Ore Processing Plant
1257254490998460416
Country: Kazakhstan Owner: KAZ Minerals PLC Capacity: 25Mt Time: August, 2014 OKTECH Products: NTC9200
1257254492399357952
Country:Zambia Owner:China Non-Ferrous (NFC) Africa Mining Plc Capacity:800,000 tons(Annual production) Time:2010-Today OKTECH Products: NTC9210, NTC9200
Luanshya Copper Mines Muliashi Project
1257254493749923840
Country:Zambia Owner:China Non-Ferrous (NFC) Africa Mining Plc Capacity:4.5 million tons of ore and 41,000 tons of copper cathodes (Annual production) Time:2012-Today OKTECH Products: NFC9180
Great Baobab, Prosopisand Surrounding Oilfield Development Project, Phase II
1257254495171792896
Country:Chad Owner:CNPCIC and PMC Time:September, 2015 OKTECH Products: NSC9700
Drilling project of Minagish Oil Field in Kuwait
1257254496576884736
Country:Kuwait Owner:Kuwait Oil Company(KOC) Time:May, 2017 OKTECH Products: BFC8110, BFC8120
Sonon Asogli Thermal Power Station
1257254497981976576
Country:Ghana Owner:Sunon Asogli Power (Ghana) Ltd Capacity:200MW Time:November, 2015 OKTECH Products: NFC 9180, NSC9700, BFC8120, NGC9810
1257254499324153856
Country: Cameroun Owner: Electricity Development corporation (EDC) Capacity: 30MW Time: January, 2016 OKTECH Products: NFC9180, NTC9210